TAPPI Visual Inspection Charts
My TAPPI Story: McKenna Goulette
Mark A. Casper
Cogentrix Energy, Inc.
Steven J. Doyon
James M. Thornton
ENSR Consulting & Eng.
Fredrick A. Weber, Jr.
Boise Cascade
With more stringent environmental regulations making it more difficult to permit new sources, it is imperative to be creative in the design and engineering of a power facility in order to facilitate the permitting process in addition to making the facility environmentally compatible. Permitting time can be substantial and public opposition can potentially stop a project. Minimizing the environmental impact can help the permitting schedule along with gaining the public’s trust in the project. A case history of a major cogeneration facility in a downtown urban area is presented that discusses the issues addressed during conception, development and design that allowed the permitting and public process to proceed in the most efficient manner possible. Designing the facility to be a minor air pollution source, making use of air pollution offsets, water consumption savings, and wastewater discharge minimization are all used to help in this process.
Experience the Power of Publications in 2026
Sponsored by the Recovery Boiler Program R&D Subcommittee of the American Forest & Paper Association (AF&PA) and published by TAPPI Press.
The best-selling text to introduce the entire technology of pulp and paper manufacture.
A project of the Yankee Dryer Safety & Reliability Committee.
TAPPI Press offers some of the most in-depth resources and references for the forest products and related industries.
Available for Purchase – Conference Proceedings
TAPPI maintains a record of key conference papers, presentations, and other conference publications, available for purchase in a variety of formats.